����������������������������������� BEACHES AND DOCKS REPORT

������������������������������������������������� March 11, 2006

 

---Put up temporary fencing across the beachfront to discourage geese from nesting on hill.

 

---Had around 30 neighbors participate in the spring beach clean up.Special thanks to Lorraine

��������� Negele for preparing the lunch at the beach.

 

---Installed a new floating dock which replaced the wood dock off the beach.Several neighbors������ ����Assisted with various phases of this effort.���

���������� Ken Heiden, Terry Dwyer, Mark Baumgarten, Jim Irving, Dave Alvey

��������������� (I apoligize to any I�ve missed.)

 

---Removed, disassembled and disposed of the old dock.Dave Dietz volunteered to be the �head

������� Wrecker� I�m not sure of who all assisted Dave in the disassembliy.Terry Dwyer was

������� �Drafted� by me and we cut the old dock into pieces small enough that it would be taken

������� Away in the annual fall trash pick-up.

 

 

---Removed the floating dock at the fishing hole in preparation for the dredging.The East

������� Side dock was disconnected to prevent damage to it�s moorings during lake draw down.

����������� Bob Edgar assisted with this

 

---Arranged for moving of boats, canoes, etc. out of the way of the contractor doing the dreging

�������� Terry Dwyer volunteered to lead this effort at a time when I was not available.My

�������� Personal thanks to Terry.

 

---Coordinated water treatment and analysis with contractors during swimming season.

 

 

������� My Thanks to all who helped during the year.