����������������������������������� BEACHES AND DOCKS REPORT
������������������������������������������������� March 11, 2006
---Put up temporary fencing across the beachfront to discourage geese from nesting on hill.
---Had around 30 neighbors participate in the spring beach clean up.� Special thanks to Lorraine
��������� Negele for preparing the lunch at the beach.
---Installed a new floating dock which replaced the wood dock off the beach.� Several neighbors������ ����Assisted with various phases of this effort.���
���������� Ken Heiden, Terry Dwyer, Mark Baumgarten, Jim Irving, Dave Alvey
��������������� (I apoligize to any I�ve missed.)
---Removed, disassembled and disposed of the old dock.� Dave Dietz volunteered to be the �head
������� Wrecker� I�m not sure of who all assisted Dave in the disassembliy.� Terry Dwyer was
������� �Drafted� by me and we cut the old dock into pieces small enough that it would be taken
������� Away in the annual fall trash pick-up.
---Removed the floating dock at the fishing hole in preparation for the dredging.� The East
������� Side dock was disconnected to prevent damage to it�s moorings during lake draw down.
����������� Bob Edgar assisted with this
---Arranged for moving of boats, canoes, etc. out of the way of the contractor doing the dreging
�������� Terry Dwyer volunteered to lead this effort at a time when I was not available.� My
�������� Personal thanks to Terry.
---Coordinated water treatment and analysis with contractors during swimming season.
������� My Thanks to all who helped during the year.
�