��Why not include the
ballfields in a full abatement?
��We put dredge spoils there (also leaves)
��Ballfields give MKL a guaranteed place for
spoils
��Offsite trucking costs at least
$250/truckload
��Estimated to save
$40K in 25 years (even paying taxes)
�The ballfields already are partially abated
��If the proposal is
approved, the FC will investigate the possibility of reducing the taxes even more.
�
��When ballfields are full with spoils, FC
recommends they be fully abated.