BEACHES AND DOCKS REPORT

                                                  March 11, 2006

 

---Put up temporary fencing across the beachfront to discourage geese from nesting on hill.

 

---Had around 30 neighbors participate in the spring beach clean up.  Special thanks to Lorraine

          Negele for preparing the lunch at the beach.

 

---Installed a new floating dock which replaced the wood dock off the beach.  Several neighbors           Assisted with various phases of this effort.   

           Ken Heiden, Terry Dwyer, Mark Baumgarten, Jim Irving, Dave Alvey

                (I apoligize to any I’ve missed.)

 

---Removed, disassembled and disposed of the old dock.  Dave Dietz volunteered to be the “head

        Wrecker” I’m not sure of who all assisted Dave in the disassembliy.  Terry Dwyer was

        “Drafted” by me and we cut the old dock into pieces small enough that it would be taken

        Away in the annual fall trash pick-up.

 

 

---Removed the floating dock at the fishing hole in preparation for the dredging.  The East

        Side dock was disconnected to prevent damage to it’s moorings during lake draw down.

            Bob Edgar assisted with this

 

---Arranged for moving of boats, canoes, etc. out of the way of the contractor doing the dreging

         Terry Dwyer volunteered to lead this effort at a time when I was not available.  My

         Personal thanks to Terry.

 

---Coordinated water treatment and analysis with contractors during swimming season.

 

 

        My Thanks to all who helped during the year.